Monday, March 27, 2023
  • English
  • Marathi
No Result
View All Result
Daily PRABHAT
  • Home
  • Latest News
  • National
  • International
  • Entertainment
  • Politics
  • Sports
  • Business
  • More
    • Health
    • Lifestyle
    • Technology
    • Science
Daily PRABHAT
No Result
View All Result
  • Home
  • Latest News
  • National
  • International
  • Entertainment
  • Politics
  • Sports
  • Business
  • More
Home International

Pakistan: Main Line Railways project under CPEC may be shelved due to China’s disagreements over feasibility costs

by
11 months ago
in International
A A
Pakistan: Main Line Railways project under CPEC may be shelved due to China’s disagreements over feasibility costs
Share on FacebookShare on Twitter

Islamabad [Pakistan], April 28 (ANI): Due to disagreement between Islamabad and Beijing on feasibility costs, Pakistan is likely to shelve the much-talked-about Main Line (ML-1) Railways project, well-informed sources told Business Recorder.

“Ministry of Railways stated that PC-1 of ML-1 project was not feasible as costs were not agreeable to the Chinese side,” the sources said adding that Minister directed that Minister for Railways should be appraised of the matter and a report should be submitted to the Ministry of Planning, Development & Special Initiatives.

Under the China Pakistan Economic Corridor (CPEC), the ML-1 project of Pakistan Railways was the largest proposed infrastructure project in the country, to which the Executive Committee of the National Economic Council (ECNEC) accorded approval at an estimated cost of US$ 6.8068 billion on August 5, 2020, the reports stated further.

Pakistan railway line project, Main Line (ML-1), is hanging in the balance owing to the financial delays by Exim Bank of China.

The newly-elected Shehbaz Sharif government in Pakistan has decided to abolish the China-Pakistan Economic Corridor (CPEC) Authority after Chinese power producers shut down 1,980 megawatts of production capacity due to non-clearance of their Rs 300 billion dues.

According to Business Recorder, for the financial negotiation of loan terms with the Chinese side, a high-level Financing Committee headed by Deputy Chairman Planning Commission was formed under the directives of the Prime Minister which has convened eight meetings so far on the issue of financing of the ML-1 project.

On April 8, 2020, a proposed term sheet comprising various terms of loan was shared with the Chinese side.

However, the final terms and conditions of the loan were to be settled after due deliberations and a negotiation process between the Financing Committees of the two countries. A formal request for the loan of Package-1 amounting to the US dollar 2.435 billion was made to the Chinese side through Economic Affairs Division (EAD) on November 25, 2020.

The issue of Pakistan Railways ML-1 has been discussed at different levels in Islamabad and Beijing but both sides could not evolve a consensus on the cost of the project.

The CPEC was flawed in its very construct as Chinese loans are commercial in nature and building infrastructure on these loans is dangerous. However, Pakistan failed to understand it as in 2021 also, Pakistan owed nearly half of its external payments obligations, amounting to USD 14 billion, to Chinese commercial banks, largely for CPEC projects. (ANI)

ShareTweetSendShareSend

Latest News

MCD seals ‘Paradise Mall’ in Rajouri Garden for non-payment of property tax dues of Rs 3 cr

Hathras case: SC dismisses UP govt’s plea against HC order to provide job to victim’s family member

SC seeks Madal Virupakshappa’s reply on Karnataka Lokayukta plea against anticipatory bail to BJP MLA in corruption case

Infinium Pharmachem Limited announces its IPO for March 31, 2023, To be listed on NSE Emerge

Forever New launches exquisite SS23 collection featuring Pooja Hegde

Ansell has opened its most significant Greenfield Manufacturing Plant in India, Investing USD 80 Million

Ahead of IPL, Jio introduces new plan for uninterrupted streaming

Merck Foundation announce 84 winners of their 2022 Media Awards from 21 African Countries

Ramagya School providing global education through international collaborations

Sotac Pharmaceuticals Ltd brings its IPO on March 28, To be listed on NSE Emerge Platform

Islamabad [Pakistan], April 28 (ANI): Due to disagreement between Islamabad and Beijing on feasibility costs, Pakistan is likely to shelve the much-talked-about Main Line (ML-1) Railways project, well-informed sources told Business Recorder.

"Ministry of Railways stated that PC-1 of ML-1 project was not feasible as costs were not agreeable to the Chinese side," the sources said adding that Minister directed that Minister for Railways should be appraised of the matter and a report should be submitted to the Ministry of Planning, Development & Special Initiatives.

Under the China Pakistan Economic Corridor (CPEC), the ML-1 project of Pakistan Railways was the largest proposed infrastructure project in the country, to which the Executive Committee of the National Economic Council (ECNEC) accorded approval at an estimated cost of US$ 6.8068 billion on August 5, 2020, the reports stated further.

Pakistan railway line project, Main Line (ML-1), is hanging in the balance owing to the financial delays by Exim Bank of China.

The newly-elected Shehbaz Sharif government in Pakistan has decided to abolish the China-Pakistan Economic Corridor (CPEC) Authority after Chinese power producers shut down 1,980 megawatts of production capacity due to non-clearance of their Rs 300 billion dues.

According to Business Recorder, for the financial negotiation of loan terms with the Chinese side, a high-level Financing Committee headed by Deputy Chairman Planning Commission was formed under the directives of the Prime Minister which has convened eight meetings so far on the issue of financing of the ML-1 project.

On April 8, 2020, a proposed term sheet comprising various terms of loan was shared with the Chinese side.

However, the final terms and conditions of the loan were to be settled after due deliberations and a negotiation process between the Financing Committees of the two countries. A formal request for the loan of Package-1 amounting to the US dollar 2.435 billion was made to the Chinese side through Economic Affairs Division (EAD) on November 25, 2020.

The issue of Pakistan Railways ML-1 has been discussed at different levels in Islamabad and Beijing but both sides could not evolve a consensus on the cost of the project.

The CPEC was flawed in its very construct as Chinese loans are commercial in nature and building infrastructure on these loans is dangerous. However, Pakistan failed to understand it as in 2021 also, Pakistan owed nearly half of its external payments obligations, amounting to USD 14 billion, to Chinese commercial banks, largely for CPEC projects. (ANI)

No Result
View All Result
  • Home
  • Latest News
  • National
  • International
  • Entertainment
  • Politics
  • Sports
  • Business
  • More
    • Health
    • Lifestyle
    • Technology
    • Science